Drilling & Workover Services

drilling

Our Expertise :

We focus on integrated international drilling and workover engineering services. The company has the capabilities of integrated wellbore engineering services such as pre-drilling, drilling, directional, mud, stimulation, completion, and other wells workover, which can meet the needs of customer diversity. The business covers mainly Tunisia on both sides (Onshore and Off-share).

Core advantage Technology : 

  • Complete process and technology for drilling and completion of oil and gas wells
  • Conventional directional and horizontal well drilling technology
  • Various types of drilling fluid service technology
  • Ultra-high temperature (greater than 150 ℃) geothermal well drilling, drilling fluid technology and technology
  • Various minor repairs, overhauls, sidetracking processes and technologies for oil and gas wells
drilling falcon crest

References of our company and its staff:

IN DRILLING & WORKOVER & RELATED SERVICES:

  • 2021-2023:
    Provision of drilling crew and logistics support to PRIMOIL SA Tunisia.
    Provision of drilling crew to DRILLSTONE Roumania.
  • 2014:
    Demobilization, preventive maintenance, packaging and export of 2 rigs 1500 & 2000 HP
    H & P (Helmerich & Payne).
  • 2015:
    Provision of drilling crew to Sea Wolf awarded by Circle Oil.
  • 2008-2012:
    Management of 2 drilling land rigs DS2 (1500 HP) & DS4 (2000 HP) and provision of drilling crew, rig move, transport and Catering
    contracted by Althani Emirates, T.P.S., Perenco, E.N.I. and Storm Venture in Tunisia.
  • 2002-2006:
    Mobilization of Great Wall 1500 HP land drilling rig, rig moves and provision of drilling Crew.
    Provision of drilling crew to PERGEMINE rig 1500 HP contracted by E.N.I.
  • 1992-1997:

Assistance & Logistic support to KCA Drilling LTD land rig 88 awarded by C.T.F. (Compagnie Tunisienne des Forages).

Provision of offshore drilling crew to READING & BATES contracted by British Gas for Hasdrubal gas field development.

  • 1980-1987:
    Supervision of Drilling & Development of Tazerka offshore project with Shell TUNIREX.

WASTE MANAGEMENT & SITE RESTORATION:

  • 2004-2011:
    Waste management of Kufpec’s, CTKCP, SODEPS, PETROASIAN and Pioneer Natural Resources cuttings.
    Restoration of KUFPEC (1), CTKCP (1) and Pioneer Natural Resources (4) sites.

PIPELINE INSTALLATION:

  • 2007- 2008:
    Installation of 73 km of flowline 4” pipeline and 65 km of gas lift pipeline for Pioneer Natural Resources at ElWaha field
    Actually NAWARA concession.

Our leading Operations manager boasts over four decades of invaluable experience in the drilling services and petroleum sector. His extensive expertise spans across Tunisia, Libya, Spain and Scotland, where he has played a pivotal role in advancing drilling operations and contributing significantly to the petroleum industry. With a wealth of knowledge accumulated over the years,our leading Operations manager has been a driving force in enhancing drilling methodologies and navigating the complexities of the field. His multifaceted experience in diverse regions reflects a profound understanding of the nuances involved in the petroleum industry, making him a seasoned professional with a deep commitment to excellence.